IMG_0546

Copyright A.J.Morgan

26th November

The inside eccentric strap ( which provides the drive for the inside valve gear ) has been machined to its final size, trial fitted and stored ready for when the inside motion is re-assembled.

IMG_0557

Copyright A.J.Morgan

2nd December

The re-metalled inside big end bearing has been machined to the correct size, trial fitted and stored ready to be put back onto the locomotive when required.